Mastering Backward Pass In Project Management

Imagine trying to build a bridge without a plan or a timetable.

Imagine starting the building project without knowing how long it will take or which steps need to be done first.

Does not it sound like chaos? The truth is that planning and scheduling are important for every project, no matter how big or complicated it is.

So, the backward pass comes into play.

The backward pass is a powerful tool that helps engineers figure out when each part of a project can finish at the latest.

It is an important part of project management, and how well you do with it can make or break your projects.

In this article, we will talk about what the backward pass means in engineering, why it is important for engineering students and engineers, and how you can use it in your projects.

So, buckle up, and let us jump into the world of backward pass!

Introduction to Backward Pass in Project Management

Formal definition:

The calculation of late finish times (dates) for all uncompleted net-work activities for a specific project is done by subtraction of durations of uncompleted activities from the scheduled finish time of the final activity.

Project management is the process of organizing people, tasks, and resources to reach certain goals.

A backward pass is an important method used in project management.

In this article, we will talk about what backward pass is, how it can be used, and how it works.

In project management, what is a "backward pass"?

A backward pass is a technique used in project management to identify the critical path and understand the project's duration.

It means figuring out the late start and late finish dates for parts of the schedule that have not been finished yet.

The critical path is the order of tasks that must be done on time for the project to be finished on time.

How Backward Pass Works

For the backward pass, you start at the planned end date of the project and move backward through the schedule network logic.

The person who gives the contract can set the end date or use a forward pass to find out when the contract will end.

In project management, a forward pass is another way to move forward through a diagram to figure out how long each activity will take in total.

To figure out the late start (LS), you do a backward pass from the late finish (LF) and take the activity duration away.

To figure out LS, use the formula: LS = LF – Duration.

For example, LS = 30 – 10 = 20 days if LF = 30 days and activity duration = 10 days.

On the other hand, to figure out the early finish (EF), you use a forward pass and move from the early start to the right to get the early finish of the project.

The formula for figuring out early start (ES) is ES = Maximum (or Highest) EF value from immediate predecessor (s).

Applications of Backward Pass

The backward pass method is helpful in a number of areas of project management, such as:

  • Identifying the critical path: By calculating the late finish and late start dates, the backward pass technique helps identify the critical path.

This information is very important for managing the project and making sure it gets done on time.

  • Understanding project duration: The backward pass helps determine the project's duration by calculating the latest possible finish date for each activity.
  • Identifying slack time: Slack time refers to the amount of time that an activity can be delayed without affecting the project's duration.

The backward pass helps find extra time, which can then be used to better manage the project's resources.

Why Skipping the Backward Pass Can Cost You Time, Money, and Sanity

Still hard to understand? Let me change the point of view a bit:

Are you ready for your mind to be blown? Do not use the backward pass if you want your project to be late, cost more money, and give you a lot of trouble.

Who needs to plan backwards and figure out when people will be late? Just try things out and see what happens, right? Okay, maybe not.

In reality, the backward pass is an important part of managing projects and can save you time, money, and your sanity.

In this article, we will talk about why the backward pass is so important in engineering, how to use it well, and why avoiding it could ruin your projects.

So let us fasten our seatbelts and dive into the world of backward pass!

Okay, that was just a joke made to look like a TV ad.

Now let's go back to the explanation.

Importance of Backward Pass

The backward pass technique is a key part of engineering project management that makes sure projects are finished on time and on budget.

By figuring out how late each activity starts and how late it ends, project managers can find the project's "critical path," which is the longest chain of activities that determines how quickly the project can be done.

Finding the Critical Path

Both forward and backward passes are used to figure out what the critical path is.

The forward pass figures out when each activity starts and ends early.

The backward pass figures out when each activity starts and ends late.

By comparing these numbers, project managers can figure out which tasks have no extra time or slack, which means that any delay in these tasks will cause the whole project to be late.

In other words, the critical path is the order of tasks that must be done on time for the project to be done in the time allotted.

This path makes it easier for project managers to plan, track, and manage their projects in a way that keeps them on track and keeps costs down.

Backward Pass Technique

To use the backward pass technique, project managers start with the planned end date of the project and work backward through the schedule network logic.

This helps figure out if there are any delays or extra time in a task.

When both forward and backward passes are made, if there is no extra time left for an activity, it is added to the critical path.

The backward pass is part of the schedule network analysis process.

It involves figuring out when each project activity will start, end, start late, or end late.

The backward pass helps find delays or extra time in an activity and finds the project's most important path.

Calculation and Values in Backward Pass

In the Critical Path Method (CPM), the backward pass is a very important step.

It is used to figure out when each activity will start and end late, which is needed to figure out how long the project will take and eventually find the critical path.

In this article, we will talk about how the backward pass in engineering project management works and how to figure out the calculations and values.

Determining Critical Path

Before you can figure out the backward pass, you need to know which part of the project is the most important.

This is done with the help of the forward pass calculations, which figure out the Early Start (ES) and Early Finish (EF) values for each activity as well as the total length of the project.

Once the critical path is found, the calculations for the backward pass can begin.

Calculating Late Start and Late Finish Values

During the backward pass, project managers move from right to left across the network diagram to subtract time from the late finish date.

They start with the project's planned end date and work backwards through the network diagram to figure out how late each activity started or finished.

To figure out the Late Start (LS) value, take the Late Finish (LF) value and take away the time it took to do the activity.

On the other hand, LF is found by taking the immediate successors with the lowest LS value.

Calculating LS and LF is the only way to find the critical path, which is the longest chain of tasks that determines how long the project can take at its shortest.

Calculating Float

Float time, also called slack time, is the amount of time an activity can be put off without changing the time it takes to finish the project.

To use both forward and backward passes to figure out float, project managers must first figure out the ES and EF values using forward pass calculations.

Once these values are known, they can use backward pass calculations to figure out the LS and LF values.

Then, you can find float by taking ES away from LS or EF away from LF.

If there is no wiggle room for an activity, it is on the critical path.

In conclusion, the backward pass is an important part of figuring out a CPM schedule.

It is used to figure out when each project activity will start late or end late.

This helps figure out the project's critical path.

To figure out float, project managers must first figure out the ES and EF values using forward pass calculations, and then the LS and LF values using backward pass calculations.

This lets the project be better planned, tracked, and managed, lowering the risk of delays and cost overruns.

Use forward and backward pass to determine project duration and critical path

Tip: Turn on the caption button if you need it. Choose “automatic translation” in the settings button, if you are not familiar with the spoken language. You may need to click on the language of the video first before your favorite language becomes available for translation.

Conclusion

As we come to the end of our look at the backward pass, it is important to remember that it is not just a math problem; it is also a way of thinking.

It is a way to think that can help you better plan and carry out projects.

It is about stepping back, looking at the whole picture, and making decisions based on the information you have.

It is about keeping your eyes on the end goal and working backwards to figure out what steps you need to take to get there.

By learning how to do the backward pass, you can see project management from a new angle that will help you be more efficient, effective, and, in the end, successful.

So, when you start a project in the future, remember to think backward, plan carefully, and do a great job.

Happy engineering!